Skip to content

Infrastructure

Facilities built for control.

9,500 m² of temperature-controlled chambers and 10,000 m² of land for expansion, in Ploiești on the A3/DN1 corridor with direct access to Bucharest and the Pan-European routes.

0 m²

Refrigerated chambers

0 m²

Frozen chambers

0 m²

Ambient warehouse

0 m²

Expansion land

The facility at golden hour — loading docks ready for dispatch.
The facility at golden hour — loading docks ready for dispatch.

On site

The facility, as it stands.

9,500 m² of chambers, five loading dock doors and 10,000 m² of land for expansion — photographed at our site in Ploiești.

Infrastructure

Facilities built for control.

9,500 m² of temperature-controlled chambers and 10,000 m² of land for expansion, in Ploiești on the A3/DN1 corridor with direct access to Bucharest and the Pan-European routes.

Storage capacity

High-bay racking across ambient, chilled and frozen chambers, scalable to seasonal peaks.

Operational flexibility

Short-term or contract storage, dedicated zones and custom handling procedures per client.

Food logistics

Hygienic zones, traceability by lot and expiry, and documentation ready for audits.

Five loading dock doors
Real-time temperature monitoring
Insulated loading docks
Backup power generation
WMS with lot & expiry tracking
Access-controlled premises
HACCP-aligned procedures

Ready to secure your cold chain?

Tell us about your products and volumes. We respond within one business day.

Request a Quote →